TECHNICAL INFORMATION
Construction Substructure
-
Distributed load < 50 kN/m2.
-
The module of substructure:
1200 x 1200 mm (Inches 47‘‘x 47‘‘) (Spacing between pedestals) is 10 kN/m2.
-
Finished floor heights (FFH) range can be from 280 to 2500 mm (inches 11‘‘ – 99‘‘).
-
Floor panel size is 600x600 mm (inches 24‘‘x 24‘‘).
-
Plenty of free space underneath the floor for installing any necessary equipment
-
System stays 100% stable even if all of the panels are removed
-
System is mobile during the installation and application.
-
Equipment is mounted directly on the T E C H N I C A L F L O O R S system.
-
Under the existing floor system it is possible to install additional equipment. Our floor system is designed integrate your additional equipment.
-
Easy maintenance throughout the whole lifespan of the system.
-
It is possible to use a variety of different floor panels (Fibre reinforced calcium sulphate panels, high density chipboard panels, air ventilation panels, steel panels, glass panels)
-
Finishing of the Panels: Laminate, Elastic floor coverings (PVC, Linoleum, Caoutchouc), Parquet, Textile floor coverings, Natural and artificial stone,specials coverings (stainless steel, cork, bulb plate), etc.
-
Fire protections. Building material class acc. to DIN EN 13501 T1 – A1.
-
It is possible to strengthen the loads to meet your certain demands.
​
Unique solutions by the T E C H N I C A L F L O O R S system
​
T E C H N I C A L F L O O R S system is suitable for complex projects. With this system, we can provide standard or non-standard solutions to meet any of your needs.
​
Fields of application:
​
-
High, medium and low tension switchgear stations;
-
Battery rooms and emergency plants;
-
Computer centers, production plants,laboratories and power plants;
-
Office and administration buildings;
-
Building services room;
-
Cleanrooms, measuring rooms, test plans;
-
Public areas, which has vehicle traffic (also dynamic loads);
-
Production areas, which experience traffic, especially fork lifts;
-
Damp and wet areas, as well as treatment rooms, medical practices, X-ray areas;
-
Heating and cooling;
-
Low construction (old buildings);
-
System with air conditioning/ventilation.